Steel Trailer


This project is started in the year of 2013. Together with orange electric cabinet, we fabricated both trailer and electric cabinet for this client. The trailer and electric cabinet set is for mining & processing equipment at Australia. 


  • Materials: Carbon steel tube Q345
  • Production Phase: 2 months
  • Surface finish: Galvanization
  • Fabrication Methods: Laser cutting, bending, welding, hot dip galvanization
  • PROJECT CHALLENGES: a.Material is Q345 carbon steel tube, which need to customize because of special thickness. b.Tires need to purchase from other province, so lead time is tight as for assembly.
  • SVEI SOLUTION: For loading strength of this trailer, we asked our material supplier to customize for Q345 steel tube of special thickness. And also we need to purchase tires from other province, so the complete production plan is important to control lead time as client required.
service